Standard

SAE ARP4902B

Withdrawn

Singles purchase not accessible

This standard can not be purchased as a single sales.

Abstract

This document provides information and guidance material to assist in assessing the need for and feasibility of developing deicing facilities, the planning (size and location)and design of deicing facilities, and assessing environmental considerations and operational considerations associated with de-icing facilities. The document presents relevant information necessary to define the need for a deicing facility and factors influencing its size, location and operation. The determination of the need for deicing facilities rests with Airports. Although this document intends to provide information to airport operator and deicing facility planner/designer, all stakeholders, including deicing service providers, should be involved in the development process.

Document information

  • Standard from SAE International
  • Published:
  • Withdrawn:
  • Document type: IS
  • Publisher SAE International
  • Distributor SAE International

Product Relations